Well, good news. The heating pipes are now ready. At least the inspectors says so. The heat is a long way from being done, but a least a bit of it is good to go.
The inspector left the papers behind, including a note about how final approval will require heating restored to the upstairs. That’s also part of the renovations — we need an air exchanger.
Mind you, there are issues with the piping I still need to have addressed, notably:
- A roughed line for a future expansion in the basement
- A patch that seems to be devoid of piping for some reason
I’m told those will be dealt with before the concrete arrives. Let’s hope so…